|
3.4. RECORDS
3.4.1. PLANS
A plan of the emergency wayfinding guidance installation showing location
of P.L. materials and component products should be provided on completion
and retained on the premises. Such a plan should be regularly updated
with subsequent changes and modifications to the system.
3.4.2. LOG BOOK
A log book should be provided for the recording of routine examination,
tests, defects and alterations.
3.4.3. INSPECTION AND MAINTENANCE MANUAL
A manual, describing routine inspection and maintenance schedules and
check lists, should be provided.
3.4.4. MEASUREMENT OF ACTIVATING ILLUMINANCE
Recommendations on the measurement of activating illuminance and resulting
luminance are given in Section 6.6.
|